How we read a utility interval file without drowning in columns
Interval files arrive as long grids of timestamps. The useful work is spotting missing days, daylight-saving jumps, and columns that are kW instead of kWh.
Field notes
These notes are written from energy consumption reporting jobs: what the meters showed, what the bills could not explain alone, and what a plant-room visit added.
Interval files arrive as long grids of timestamps. The useful work is spotting missing days, daylight-saving jumps, and columns that are kW instead of kWh.
In older mixed-use blocks, the corridor and dock lights were never given their own meter. Allocation notes have to say that out loud.
A heating-season review is easier to defend when the plant room is recorded as it was on the visit day, not as the drawing set imagined it.
A floor can look busy in the access logs and still show a quiet electricity bill, or the reverse. The report has to hold both facts.